Why Balloon Drawings Are Mandatory?

IATF 16949 / PPAP and AS9102 share the same core objective: traceability. This is not a recommended best practice — it is a strict compliance requirement.

IATF 16949 – PPAP Deliverables (Automotive Industry)

  • 01 Full‑Dimension Inspection All product dimensions documented on design records shall be measured completely.
  • 02 One‑to‑One Mapping Every balloon callout shall map to a corresponding dimension on the drawing.
  • 03 Gage Traceability Inspection tools shall be traceable to national / international metrology standards.
  • 04 PPAP Submission Balloon‑annotated drawings together with measurement results constitute core deliverables.

AS9102C – First‑Article Inspection (Aerospace)

  • 01 Unique Indexing Each design characteristic is assigned a unique identifier, consistent with FAIR forms.
  • 02 Recorded Measured Values All variable‑measurement characteristics shall retain numeric test results.
  • 03 Gage‑to‑Spec Matching Vernier calipers for linear dimensions; CMM for complex GD&T features.
  • 04 Valid Calibration Inspection equipment shall remain within its calibration validity period during testing.

How to add balloon callouts for dimension objects automaticly?

Similar Posts